US Project - Tube Pick and Place
13/05/2019
Project located the tubes from the feeder bowl and the UR picked up the tubes and placed them into the current bending machine.
The bending machine the customer had was operated by a person, who could average about 4000 tubes per shift. The UR system averages over 9000 tubes per shift.